Quality Control

 

QUALITY CONTROL


1)  Each phase of work is recored on the working sheet for the product. All the made pieces, time of production and worker's ID are recorded.


2)  After each phase, the product is tested visually and with measuring. Every working sheet includes also the drawing of the product.


3)  Every production phase controls the previous phase.


4)  Before packaging every product is checked by the packaging team leader.


5)  At the end, the production manager checks and signs the end control sheet.




This site uses cookies. By continuing to browse this site you are agreeing to our use of cookies. Find out more here.
x
Website by RUCAZA 2013